Sunday, May 16, 2010

Step by step

Justin has been hard at work on the back yard.  He took 6 loads of dirt and gravel to the dump, leveled the whole thing, built a staircase, and installed a paver path from the back door, past the guest room, and to the east side of the house.  I helped him put in edging today in preparation for sod later this week.  We also cleaned up a ton of leftover construction garbage and built a raised bed for the world's smallest garden.

Paver path to guest room (and edging for flower beds)

Another view of the paver path

New stairs on east side of house and raised garden

We're also continuing to make some progress in the basement and bunkhouse.  We had a landing built at the bottom of the stairs and laid tile over the whole thing.  The pictures don't quite do it justice. 

Tiled stairs in basement

Another view of the basement stairs